Saturday, April 11, 2009

Week 15 - Bathroom tiling, kitchen cabinets, fireplace tiling, final trim, loft hatch and tree removal

The master bathroom tiling nearly finished this week (just need grouting) with a wonderful job done on the floor tiles:



Also the guest bathroom shower tiles were installed:



And the fireplace wall was tiled covering up the brick:



The wall mounted kitchen cabinets were installed this week:



And here is a shot looking from the living room, through the kitchen into the sun room - beautiful large open space:



The loft hatch was installed:



Funny story....we arranged to have the old pine tree removed from the side of the house and the team removed every living thing on the side of the house including all the beds of plants I had carefully transplanted to create some layering once the hedge had been planted. This is what it looks like now....:


No comments: