Week 8 - Windows and electrical

This week the windows went in and there was more electrical work. All the flourescent lights are installed and wired up.


The high up window in the sunroom will give us some nice light without having to look into the next door house


The new windows in the kitchen are in. The one on the right will be over the kitchen sink.


The patio doors in the master bedroom are in. There will be a fence up outside so we don't have to look out onto the road.


The new patio doors and steps from the street. We plan to add a deck seating area outside and the old pine tree on the right is going to come down to give us some more closed in yard space.


All the light cans are installed in the kitchen, one switch will operate the outside lights over the counters and another switch will operate the center strip of lights.