Week 9 - Electrical, low voltage, roofing and duct work

There is not much electrical work left now, there are wires everywhere! We wired the house up for Internet, phone and cable TV this week as well as set up the in-ceiling home theater. The heating and cooling duct work went in this week as well as the new furnace. Finally the roofing work was done in a brief dry patch between the rain showers.

The sunroom and space between it and the kitchen now has a subfloor!

The master bathroom is a good example of plumbing and wires everywhere! 


In a closet we have a central junction box controlling all the cable, phone and ethernet cables throughout the house so we can have internet ports in every room


The yellow wires at the back (closer) are for the home theatre rear speakers, the 3 at the front are for the front speakers - all mounted into the ceiling. You can also see four of the six flourescent lights in the ceiling of the living room.


New furnace in the loft



The duct work was completed this week, all the heating and cooling air will come through the ceiling in the rooms so we don't have to lose closet space running the ducts from the furnace in the loft to under the floor